Aug 9, 2015
Wrought Iron Handrails Hampstead Fenton House, London NW3 The National Trust wanted us to provide new wrought iron handrails on flight of steps to the same design as those elsewhere in the garden. We carefully removed a spindle from the other steps to act as a pattern...
Aug 9, 2015
Steel Platform Fabrication London Energy Centre Roof, Whipps Cross Hospital, London E17 Our task was to provide a steel platform (with steps and handrails) to support air conditioning units on the roof of the hospital’s Energy Centre. Working to civil & structural...
Aug 9, 2015
Entrance Canopy LSE Library, London WC2 We were asked to provide structural steelwork to support the increased size of the main entrance to the library, then build an entrance canopy over it. We manufactured and installed supporting steelwork for the enlarged library...
Aug 9, 2015
Steel Handrails Lena Gardens Primary School, Hammersmith, London W6 We were asked to provide new steel handrails for the ramp a builder was putting in at the school. We fabricated the railings from mild steel tubing, infilled them with wire mesh, then had them powder...
Aug 9, 2015
Handrail Maintenance Hertford Regional College For the third year running we are carrying out a bi-annual survey of the handrails at the college’s Ware and Broxbourne campuses. During the survey, all parts are thouroughly inspected and repairs are carried out....